The Transformer Testing Laboratory (Testing Lab) was built at Monash University Clayton in 2006. The facility features a test transformer equipped with the dedicated control system and two monitoring systems – an in-house built multi-channel data acquisition system and a commercial Dynamic Ratings Monitoring Control and Communication (DRMCC) unit.
Test transformer nameplate data:
- Year of Manufacture: 2006
- Manufacturer: Wilson Transformer Company
- Rated Power, kVA: 468/936
- Rated Voltage, kV: 22/4.5/0.4
- Cooling Types: ONAN, ONAF, OFAN, OFAF
- Number of Phases: 3
- Frequency, Hz: 50
- Mass Total (including Oil), kg: 6850
- Mass of Oil, kg: 2650
- Oil Preservation System: Conservator with Rubber Bag.
Features of the test transformer:
- Clamping pressure of phase windings in transformer (for research purposes)
- Five glass observation windows on lid and side walls of transformer
- Accessible paper sample holders installed inside transformer
- 3-phase variac for loading the transformer
- External heater for establishing temperature and moisture equilibriums in transformer
- Moisturising system for increasing moisture content of transformer insulation
- Valves for connecting commercial on-line dryout systems to transformer
- Flanges for connecting other cooling systems for testing, validation and improvement
- Valves, ports and flanges for inserting additional devices, monitors and samples into transformer
- Valves and ports for sampling oil from various points in transformer
- Valves and ports for injecting oil samples containing known concentrations of dissolved gases of interest into transformer
- A stand-alone tank of 3.6 m3 volume for storing oil temporary removed from transformer
- Overhead crane of 8 ton capacity.
On-line monitoring systems and devices:
- Data Acquisition System A – an in-house built multi-channel system
- Data Acquisition System B – a DRMCC unit from Dynamic Ratings
- Fibre-optic probes for winding temperature monitoring: 16
- Thermocouples: inside core – 7, at top and bottom end rings – 6, in top and bottom oil – 7
- RTD temperature probes – 8
- Winding Temperature Indicator (WTI) – 1
- Moisture in oil transmitters – 5
- Ultrasound oil flow meter – 1
- Oil pressure sensors – 2 (before and after pump)
- Voltage and current monitors.